#Construction cost of Euro-Asian oil corridor's #Ukraine-#Poland part reduced (Exclusive) https://en.trend.az/business/energy/2941830.html
Trend.Az
Construction cost of Euro-Asian oil corridor's Ukraine-Poland part reduced (Exclusive)
The cost of the Brody (Ukraine)-Adamova Zastava (Poland) oil pipeline project has been reduced by approximately 130 million euros as a result of a feasibility study update.